Platform upgraded. Please re-register to continue accessing our community! Sign Up Now >

OP220+OP230 ECU And Motor Assembly Station

OP220+OP230 ECU And Motor Assembly Station
Premium
OP220+OP230 ECU and Motor Assembly Station, 1. Purpose: To assemble the ECU, wiring harness, etc. onto the motor using screws 2. Compatible Products: A13TE, FE-3DA, ZTM11E 3. Equipment Specifications: 2000mm(W)x1500mm(L)x2000mm(H) 4. Production Cycle: ≤50s 5. Equipment Technical Parameters 5.1 Equipment Power: 5kw; 5.2 Air Source: ≥0.5Mpa clean, oil-free, and water-free compressed air source. Air Consumption: 3L/min. 5.3 Equipment Operation Mode: Product loading/unloading is performed by the operator (manual), assembly work is completed by the operator (manual) 5.4 Electric Tightening Wrench Accuracy: ±5% Nm 5.5 Qualification Criteria: Bolt tightening torque must be within the required range; 6. Control Points: Fixture error-proofing; error-proofing for missed tightening (torque gun torque feedback); detection marker pen point inspection; manual wrench confirmation

Premium download

Subscribe to access all premium projects, a good reference data source for your engineering design.

Subscribe to download
10.8K Views
9.0K Downloads

Published:

Jan 06, 2026 10:56 AM

Version:

v1

Category:

Design Software:

Version:

Industry Application:

Sharing Level:

verda.hackett's items

Similar items

We use cookies to personalize your experience. By continuing to visit this website you agree to our use of cookies

More